REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · IRON ORE

Wiluna West

OPERATOR · GWR Group Limited (Golden West Resources) / Fe Limited (FEL) — Joint Venture (60% Fe Limited / 40% GWR Group) TYPE · Open Cut / Surface Mining — Direct Shipping Ore (DSO) Iron Ore REGION · Mid-West
01

Operation Details

Operator
GWR Group Limited (Golden West Resources) / Fe Limited (FEL) — Joint Venture (60% Fe Limited / 40% GWR Group)
Commodity
Iron Ore
Type
Open Cut / Surface Mining — Direct Shipping Ore (DSO) Iron Ore
Region
Mid-West
District
Wiluna
Latitude
-26.791807
Longitude
119.954649
02

Compliance & B2B Logistics

Access Logistics & DIDO

FIFO rotational rosters via Wiluna airstrip; road haulage via Great Northern Highway corridor to port infrastructure (Geraldton/Port Hedland axis); DIDO access from Meekatharra regional hub

Camp Facilities & Telecom

Temporary camp infrastructure on-site consistent with remote DSO operations; Telstra network coverage limited — satellite communications (VSAT) likely primary backbone
03

Project Logistics & B2B Overview

Geographic Location and Topography

Joyners Find is situated within the Wiluna Greenstone Belt, Mid-West Region of Western Australia, approximately 960 km northeast of Perth. The terrain is characterised by flat to gently undulating semi-arid plains with shallow regolith profiles overlying Archaean basement sequences. This low-relief topography facilitates bulk earthmoving operations with minimal pre-stripping complexity, though seasonal dust suppression and haul road stabilisation remain critical operational variables for maintaining productivity benchmarks.

B2B Operational Cycle and Workforce Logistics

The project operates under a FIFO rotational roster model, with personnel mobilised primarily through Wiluna's regional airstrip or via DIDO corridors from Meekatharra. As a Joint Venture between Fe Limited (60%) and GWR Group (40%), procurement and contractor engagement follow dual-entity governance protocols. Remote camp support — including catering, medical, and communications infrastructure — is essential given the site's isolation exceeding 200 km from the nearest service township.

  • Primary workforce access: Wiluna airstrip (FIFO) and Great Northern Highway (DIDO)
  • JV governance: dual procurement approval chains (Fe Limited + GWR Group)
  • Camp services: catering, medic, VSAT comms, potable water supply
  • Roster cycles: typically 2:1 or 8:6 swing configurations for remote DSO sites

Extraction Engineering and Material Handling Infrastructure

The Joyners Find deposit targets Direct Shipping Ore (DSO) hematite and goethite mineralisation, requiring minimal beneficiation prior to export. Run-of-mine material is processed through primary crushing and screening circuits. Given the project scale, conveyor belt systems are deployed for ROM pad to crusher feed management, minimising truck cycle times. Haul road design must account for fine iron ore dust generation, mandating sealed or chemically-treated surfaces to protect equipment and comply with air quality standards.

  • Ore type: DSO hematite/goethite — low processing intensity
  • Infrastructure: primary crusher, ROM pad, screening plant
  • Conveyor systems: ROM-to-crusher feed belt circuits
  • Haul roads: dust suppression via chemical binders or water carts
  • Export pathway: road haulage to Geraldton Port (approx. 750 km)

ESG, Value Chain and Sustainability

Operating in a remote, water-scarce environment, the Joyners Find JV faces material ESG obligations under ASX listing requirements applicable to both Fe Limited and GWR Group. Decarbonisation pathways for remote DSO operations increasingly incorporate hybrid solar-diesel microgrids to reduce Scope 1 emissions from camp and processing power loads. Water recycling within the crushing and screening circuit is a key sustainability lever. Rehabilitation planning aligned with DMIRS (WA) standards governs progressive land restoration commitments throughout the operational lifecycle.

  • Energy: hybrid solar-diesel microgrid potential for camp and plant loads
  • Water: closed-loop recycling within processing circuits
  • Reporting: ASX ESG disclosure obligations (both JV partners)
  • Rehabilitation: DMIRS-compliant progressive restoration plans
  • Scope 1 reduction: electrification of light vehicles under evaluation
Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Wiluna West.
Get listed