REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · IRON ORE

West Angelas

OPERATOR · Rio Tinto Iron Ore (operator) / Robe River Iron Associates JV (Rio Tinto 53%, Mitsui Iron Ore Development 33%, Nippon Steel 14%) TYPE · Open Pit (Iron Ore) REGION · Pilbara
01

Operation Details

Operator
Rio Tinto Iron Ore (operator) / Robe River Iron Associates JV (Rio Tinto 53%, Mitsui Iron Ore Development 33%, Nippon Steel 14%)
Commodity
Iron Ore
Type
Open Pit (Iron Ore)
Region
Pilbara
District
West Pilbara M.F.
Latitude
-23.184926
Longitude
118.784609
02

Compliance & B2B Logistics

Access Logistics & DIDO

FIFO via Paraburdoo or Newman airports; ore railed via Robe River railway corridor to Cape Lambert port terminal
03

Project Logistics & B2B Overview

Geographic Location and Topography

West Angelas is situated in the West Pilbara Mineral Field, approximately 110 km northwest of Newman, Western Australia. The terrain is characterised by extreme arid conditions, with annual rainfall below 300 mm and summer temperatures routinely exceeding 45°C. Water supply for dust suppression, processing, and camp operations depends entirely on managed bore-field extraction and strict recycling protocols. This hydrological constraint is a primary operational risk factor for all on-site contractors and vendors.

B2B Operational Cycle and Commercial Activity

The operation runs 24/7 continuous mining cycles across multiple open pit benches, sustaining a heavy diesel burn rate across a fleet of ultra-class haul trucks, blast drills, and ancillary equipment. Power supply relies on dedicated diesel generation infrastructure and high-voltage distribution substations to maintain uninterrupted crushing, screening, and train-load-out operations. FIFO workforce rotations are managed through Paraburdoo and Newman airports, creating sustained demand for camp services, catering, and maintenance contractors.

Extraction Engineering and Processing Infrastructure

West Angelas processes direct-shipped ore (DSO) — high-grade hematite requiring primary crushing and screening rather than complex beneficiation. The primary crushing circuit feeds a multi-stage screening plant calibrated to lump and fines product specifications. Ore is conveyed to a train load-out facility and transported via the Robe River railway to Cape Lambert. The absence of flotation circuits reduces reagent demand but places extreme physical wear loads on crusher liners, screen media, and conveyor systems.

ESG, Value Chain and Sustainability

Rio Tinto has committed to net-zero Scope 1 and 2 emissions by 2050, with a 2030 interim target of 50% reduction. West Angelas is included in Rio Tinto's Pilbara-wide decarbonisation roadmap, which evaluates solar-diesel hybrid microgrids and battery energy storage to displace diesel generation. Autonomous haulage systems (AHS) already deployed across Pilbara assets reduce fuel consumption per tonne moved. ESG reporting aligns with GRI and TCFD frameworks, directly influencing vendor qualification and supply chain ESG compliance requirements.

Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.

Procurement

B2B Services Available at this Mine

Specialist contractors and suppliers operating across this mine site.

Supplier?
Serve West Angelas.
Get listed