REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · GOLD

Vivien Gold Mine

OPERATOR · Labyrinth Resources Limited (LRL) / formerly Ramelius Resources Ltd TYPE · Underground hard-rock gold mining REGION · Goldfields-Esperance
01

Operation Details

Operator
Labyrinth Resources Limited (LRL) / formerly Ramelius Resources Ltd
Commodity
Gold
Type
Underground hard-rock gold mining
Region
Goldfields-Esperance
District
Lawlers
Latitude
-27.976462
Longitude
120.568532
02

Compliance & B2B Logistics

Access Logistics & DIDO

FIFO rotational rosters via Leinster or Kalgoorlie air corridors; road access via Great Northern Highway network into Lawlers district

Camp Facilities & Telecom

Remote camp infrastructure required; Telstra network coverage limited — satellite comms dependency in Lawlers corridor
03

Project Logistics & B2B Overview

Geographic Location and Topography

The Vivien Gold Mine is situated within the Lawlers district, Goldfields-Esperance Region, Western Australia — approximately 650 km northeast of Perth. The terrain is characterised by semi-arid to arid scrubland, with extreme diurnal temperature variation and minimal annual rainfall averaging below 250 mm. Operational water supply relies on licensed borefield extraction and managed reticulation systems. Dust suppression, evaporation management, and potable water logistics represent critical non-negotiable cost centres for any incoming B2B contractor or site services provider.

B2B Lifecycle and Operations

Vivien operated under Ramelius Resources from 2014 to 2023, establishing a proven underground production history. In April 2024, ownership transferred via trade sale; Labyrinth Resources Limited (LRL) subsequently executed a binding share sale agreement to acquire 100% through Distilled Analytics Pty Ltd. The asset is currently in a transitional ownership phase, creating active B2B procurement windows across site rehabilitation, resource definition drilling, and operational restart planning. FIFO rotational rosters — typically 8/6 or 14/7 cycles — govern all personnel mobilisation from Kalgoorlie or Perth hubs.

Engineering and Extraction Infrastructure

Vivien's underground geometry demands a narrow-vein hard-rock extraction methodology, historically supported by decline access and mechanised stoping. Processing infrastructure in the Lawlers corridor has historically been linked to toll-milling arrangements, given the district's sparse standalone plant capacity. Any operational restart will require assessment of the primary crushing and grinding circuit, CIL or flotation configuration, and reagent supply chains. Metallurgical testwork completed by Gorilla Gold underpins the current resource estimate, providing a baseline for engineering feasibility and capital expenditure scoping for prospective operators.

ESG, Value Chain and Sustainability

Operations within the Lawlers district fall under Western Australian Aboriginal Heritage Act obligations, requiring active engagement with Traditional Owner groups — principally Wiluna and Tjiwarl native title holders. B2B vendors supplying site services must demonstrate compliance with heritage survey protocols prior to any ground disturbance. Indigenous procurement commitments and Reconciliation Action Plans (RAP) are increasingly mandated by institutional investors and joint venture partners. Environmental bond obligations, tailings management planning, and water licence compliance under DWER frameworks constitute the non-negotiable ESG baseline for any incoming operator or contractor consortium.

Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Vivien Gold Mine.
Get listed