REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · GEM & SEMI-PRECIOUS STONES

Tomkap Tourmaline Mine

OPERATOR · Tomkap Tourmaline Mine (operator: Tom Kapitany / Crystal World Australia) TYPE · Open-cut artisanal/small-scale selective hand-sorting and surface excavation of dravite tourmaline gem material REGION · Gascoyne
01

Operation Details

Operator
Tomkap Tourmaline Mine (operator: Tom Kapitany / Crystal World Australia)
Commodity
Gem & Semi-Precious Stones
Type
Open-cut artisanal/small-scale selective hand-sorting and surface excavation of dravite tourmaline gem material
Region
Gascoyne
District
Gascoyne M.F.
Latitude
-24.573049
Longitude
116.175608
02

Compliance & B2B Logistics

Access Logistics & DIDO

DIDO road access via Yinnietharra Station tracks, Gascoyne region WA; nearest service hub Carnarvon (~250 km SW); unsealed outback roads require 4WD high-clearance fleet
03

Project Logistics & B2B Overview

Geographic Location and Topography

The Yinnietharra Dravite deposit sits within the Gascoyne region of Western Australia, characterised by semi-arid, low-relief plateau terrain dissected by ephemeral creek systems. The shallow regolith profile and lateritic surface cover directly condition mass earthmoving scope, limiting heavy machinery deployment. Selective manual excavation dominates due to fragile gem-bearing host rock. Seasonal flooding of the Gascoyne River catchment imposes strict operational windows, compressing productive campaign periods to dry-season schedules.

B2B Lifecycle and Operational Cycle

Originally exploited by A. Soklich (1968–1971), the lease was acquired in 2010 by Tom Kapitany and rebranded as Tomkap Tourmaline Mine. The operation follows a small-scale, campaign-based model rather than continuous production. Key B2B considerations include:

  • FIFO/DIDO roster constraints due to extreme remoteness (~250 km from Carnarvon)
  • No permanent on-site workforce infrastructure confirmed
  • Gem material commercialised via Crystal World Australia's direct retail and wholesale channels
  • Lease status: Operating under WA Department of Mines tenement framework

Extraction Engineering and Infrastructure

The mineralisation targets dravite tourmaline (magnesium-rich end-member) hosted in Proterozoic metamorphic sequences. Extraction methodology is artisanal-selective, with no conventional primary crushing or flotation circuit deployed. Key engineering parameters:

  • Hand-sorting and manual disaggregation of pegmatitic/metamorphic host matrix
  • No milling or chemical beneficiation reported
  • Water supply logistics critical given arid site conditions
  • Gem recovery prioritises crystal integrity over volumetric throughput

ESG, Value Chain and Sustainability

As a small-scale gem operation, formal ESG reporting frameworks are not publicly documented. However, WA Mining Act obligations apply to tenement rehabilitation. Sustainability considerations include:

  • Minimal tailings generation — no processing residues from chemical circuits
  • Low surface disturbance footprint relative to bulk commodity operations
  • Rehabilitation liability managed under DMP WA tenement conditions
  • Provenance traceability via Crystal World Australia supports ethical gem supply chain positioning
Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Tomkap Tourmaline Mine.
Get listed