REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · HEAVY MINERAL SANDS

Thunderbird

OPERATOR · Kimberley Mineral Sands Pty Ltd (KMS) — 50:50 JV: Sheffield Resources Limited & YGH Australia Investment Pty Ltd (Yansteel) TYPE · Heavy Mineral Sands (HMS) — Dry Mining / Wet Concentrator Plant (WCP) — Primary commodities: Ilmenite, Zircon, Leucoxene, Rutile REGION · Kimberley
01

Operation Details

Operator
Kimberley Mineral Sands Pty Ltd (KMS) — 50:50 JV: Sheffield Resources Limited & YGH Australia Investment Pty Ltd (Yansteel)
Commodity
Heavy Mineral Sands
Type
Heavy Mineral Sands (HMS) — Dry Mining / Wet Concentrator Plant (WCP) — Primary commodities: Ilmenite, Zircon, Leucoxene, Rutile
Region
Kimberley
District
West Kimberley M.F.
Latitude
-17.431701
Longitude
122.967888
02

Compliance & B2B Logistics

Access Logistics & DIDO

FIFO operations via Broome Airport (BME) — Site located ~90 km north of Broome, West Kimberley region, WA — Road access via Cape Leveque Road — Port logistics via Broome Port Authority for mineral product export

Camp Facilities & Telecom

Permanent on-site accommodation village operational — Telstra network coverage applicable to Broome/Dampier Peninsula corridor — Remote site communications infrastructure in place
03

Project Logistics & B2B Overview

Geographic Location and Topography

The Thunderbird Heavy Mineral Sands deposit is situated approximately 90 km north of Broome on the Dampier Peninsula, West Kimberley, Western Australia. The terrain is characterised by low-relief coastal plains with shallow, unconsolidated sand profiles — ideal for bulk earthmoving operations but highly sensitive to seasonal monsoonal flooding (wet season: November–April). Flat topography facilitates large-scale strip mining sequences, yet the remote, laterite-capped landscape demands robust haul road engineering and dust suppression protocols to maintain continuous ore movement efficiency.

B2B Lifecycle and Operational Requirements

As an operating mine, Thunderbird presents acute B2B procurement demand across its full asset lifecycle. The remote location — over 90 km from Broome's service hub — creates critical dependency on local mechanical workshops and mobile maintenance contractors to minimise costly unplanned downtime on WCP and mining fleet assets. Key B2B supply vectors include:

  • Heavy mobile equipment (HME) servicing and parts supply
  • Reagent and consumable logistics to site
  • Electrical and instrumentation (E&I) maintenance contracts
  • Camp catering, facilities management and FIFO crew logistics

Extraction Engineering and Processing Infrastructure

Thunderbird employs a Wet Concentrator Plant (WCP) processing dredge-mined ore slurry through gravity spirals to produce a Heavy Mineral Concentrate (HMC). Downstream, a Mineral Separation Plant (MSP) applies electrostatic and magnetic separation to isolate ilmenite, zircon, leucoxene and rutile streams. The physico-chemical demands are stringent:

  • Precise slurry density and particle size control (<1 mm fraction)
  • High-voltage electrostatic separator maintenance
  • Water recycling circuits with strict turbidity management
  • Reagent dosing for zircon flotation circuits

ESG, Value Chain and Sustainability

KMS operates under a proactive rehabilitation mandate integral to its mining lease conditions. The Thunderbird model applies a continuous strip-mining and concurrent backfill sequence, minimising the active disturbance footprint at any given time. Tailings storage facilities (TSF) are engineered for zero-discharge, with processed sand tailings redeposited into mined voids. ESG commitments include:

  • Dampier Peninsula Traditional Owner agreements and cultural heritage protocols
  • Progressive landform rehabilitation with native species revegetation
  • Water balance management under WA DWER licence conditions
  • Annual sustainability reporting aligned to GRI standards
Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Thunderbird.
Get listed