REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · LIMESTONE - LIMESAND

Tamarine Limestone

OPERATOR · First Quantum Minerals Ltd. (Ravensthorpe Project) TYPE · Open Cut / Quarry — Limestone and Limesand extraction REGION · Goldfields-Esperance
01

Operation Details

Operator
First Quantum Minerals Ltd. (Ravensthorpe Project)
Commodity
Limestone - Limesand
Type
Open Cut / Quarry — Limestone and Limesand extraction
Region
Goldfields-Esperance
District
Phillips River M.F.
Latitude
-33.804229
Longitude
120.287919
02

Project Logistics & B2B Overview

Geographic Location and Topography

The Tamarine limestone and limesand operation (site code S0019572) is situated within the Phillips River Mining Field, Goldfields-Esperance Region, Western Australia. The terrain is characterised by low-relief lateritic plains with fine red-dirt overburden — a critical operational variable. Airborne dust suppression and high-grade filtration systems are non-negotiable requirements, as particulate infiltration accelerates wear rates across all rotating and pneumatic equipment deployed on site.

B2B Lifecycle and Operational Continuity

Operating under the Ravensthorpe – First Quantum project umbrella, Tamarine supplies limestone and limesand as process inputs — likely for pH control and reagent use in adjacent nickel hydrometallurgical circuits. The acute dependency on local mechanical workshops cannot be overstated: remote location and single-commodity supply chains mean unplanned downtime carries disproportionate cost penalties. B2B vendors offering on-call field service, rapid parts logistics, and mobile maintenance units hold a decisive competitive advantage here.

Extraction Engineering and Infrastructure

Material handling at Tamarine involves open-cut quarrying of competent limestone and unconsolidated limesand horizons, demanding a dual-mode extraction strategy. Conveyor belt systems manage bulk transfer across processing stages, with abrasion-resistant belting and idler assemblies subject to accelerated degradation from siliceous fines. Engineering procurement must prioritise:

  • Heavy-duty conveyor components rated for abrasive carbonate-silica blends
  • Dust containment hoods and transfer point sealing systems
  • Wear-resistant liners for chutes, hoppers, and crusher feed zones
  • Mobile crushing and screening units adaptable to variable limesand gradations

ESG, Value Chain and Sustainability

As a satellite operation feeding First Quantum's Ravensthorpe processing complex, Tamarine is subject to Western Australia's Mining Rehabilitation Fund (MRF) obligations and DMP progressive rehabilitation mandates. Tailings and overburden management follow strict tailings facility containment protocols aligned with ANCOLD guidelines. ESG-aligned vendors should be prepared to demonstrate:

  • Dust suppression and water management compliance documentation
  • Proactive landform rehabilitation scheduling per approved Mine Closure Plans
  • Biodiversity offset reporting aligned with WA Environmental Protection Act requirements
Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Tamarine Limestone.
Get listed