MINE PROFILE · COPPER - LEAD - ZINC

Sulphur Springs

OPERATOR · Develop Global Limited (ASX: DVP) TYPE · Underground (VMS-style polymetallic: Copper, Lead, Zinc) REGION · Pilbara
01

Operation Details

Operator
Develop Global Limited (ASX: DVP)
Commodity
Copper - Lead - Zinc
Type
Underground (VMS-style polymetallic: Copper, Lead, Zinc)
Region
Pilbara
District
Marble Bar
Latitude
-21.146496
Longitude
119.211963
02

Compliance & B2B Logistics

Access Logistics & DIDO

FIFO via Port Hedland Airport; road access via Great Northern Highway to Marble Bar Road, Pilbara WA
03

Project Logistics & B2B Overview

Geographic Location and Topography

Sulphur Springs Mine Portal is situated near Marble Bar, Pilbara Region, Western Australia — statistically one of the hottest inhabited zones on Earth, with ambient temperatures routinely exceeding 45°C. The terrain is characterised by rugged Archaean greenstone belts, imposing significant mechanical stress on surface infrastructure. Thermal management of diesel-powered heavy equipment is a non-negotiable operational priority. Underground workings provide partial thermal relief, but portal-level infrastructure and haul roads demand rigorous heat-load engineering protocols year-round.

B2B Lifecycle and Operational Status

Currently classified as Operating under Develop Global Limited (ASX: DVP), which assumed full operational control on 27 February 2025 following the transition from Venturex Resources Limited. The site represents a critical polymetallic asset within DVP's portfolio. For B2B vendors and contractors, the site's remote location — approximately 200 km southeast of Port Hedland — creates an acute dependency on local and regional mechanical workshops. Unplanned equipment downtime carries severe cost penalties; proximity-based service agreements are strategically essential for any supplier seeking preferred-vendor status.

Extraction Engineering and Processing Infrastructure

The Sulphur Springs deposit is a Volcanogenic Massive Sulphide (VMS) system requiring a multi-stage processing circuit. Key engineering components include:

  • Primary crushing and SAG/ball mill grinding circuit for sulphide ore liberation
  • Selective differential flotation plant producing separate Cu, Pb, and Zn concentrates
  • High reagent-demand environment (xanthates, frothers, pH modifiers) requiring precise dosing control
  • Thickener and filter circuits for concentrate dewatering
  • Cooling systems for mill bearings and flotation cells under extreme ambient thermal loads

Physico-chemical process stability is the primary engineering challenge at this latitude.

ESG, Value Chain and Sustainability

Develop Global operates under Western Australia's stringent Mining Rehabilitation Fund (MRF) obligations. Sulphur Springs' ESG framework centres on:

  • Engineered Tailings Storage Facility (TSF) with lined containment and leachate monitoring
  • Progressive rehabilitation of disturbed landforms concurrent with active mining
  • Acid Rock Drainage (ARD) risk management — critical given the sulphide-rich ore body
  • Water recycling from TSF decant to reduce freshwater extraction from the Pilbara catchment
  • Biodiversity offset commitments aligned with EPBC Act requirements

Proactive closure planning is embedded in the project's DFS documentation, reflecting investor ESG scrutiny at ASX level.

Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.