REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · LIMESTONE - LIMESAND

Shark Bay Shell Grit

TYPE · Open Cut / Surface Mining — Limestone (Limesand / Shellgrit) REGION · Wheatbelt
01

Operation Details

Commodity
Limestone - Limesand
Type
Open Cut / Surface Mining — Limestone (Limesand / Shellgrit)
Region
Wheatbelt
District
South West M.F.
Latitude
-30.186327
Longitude
115.00481
02

Compliance & B2B Logistics

Access Logistics & DIDO

DIDO — Road access via South West Highway and regional arterials servicing the Wheatbelt South West M.F. corridor; proximity to Bunbury port precinct supports bulk mineral dispatch.
03

Project Logistics & B2B Overview

Geographic Location and Topography

Sandy Point Shellgrit is situated within the South West Mining Field of Western Australia's Wheatbelt region — a low-relief, coastal-proximate landscape characterised by shallow unconsolidated sedimentary sequences and aeolian shell deposits. The flat to gently undulating terrain minimises overburden stripping ratios, enabling high-efficiency surface extraction. Proximity to coastal inlets facilitates direct access to biogenic carbonate accumulations. Low topographic relief reduces earthmoving complexity but demands precise water table management during wet-season operations.

B2B Operational Lifecycle and Logistics

As an operating quarry, Sandy Point Shellgrit functions within a DIDO (Drive-In Drive-Out) labour model typical of Wheatbelt regional operations, drawing workforce from nearby centres including Bunbury and Mandurah. No FIFO camp infrastructure has been identified on-site. Supply chain integration targets:

  • Bulk haulage via regional road networks to agricultural and construction end-users
  • Seasonal demand cycles aligned with WA grain-belt soil amendment programs
  • Short-haul logistics to coastal dispatch points for marine or port-based offtake

Extraction Engineering and Processing Infrastructure

The deposit comprises biogenic limesand and shellgrit — high-calcium carbonate material requiring minimal comminution. Primary processing involves:

  • Mechanical screening and wet or dry classification to achieve particle size specifications
  • No conventional crush-and-grind circuit required — material friability allows direct scalping
  • Stockpile management for moisture control and product segregation by grade
  • Quality parameters governed by CaCO₃ purity thresholds for agricultural lime and construction fill applications

Absence of hard-rock processing significantly reduces CAPEX and energy intensity per tonne.

ESG, Value Chain and Sustainability

Limesand operations carry an inherently low carbon intensity profile relative to hard-rock mining — reduced blasting, minimal crushing energy, and short haul distances compress Scope 1 emissions. Key ESG considerations include:

  • Land rehabilitation obligations under WA DMP/DMIRS tenure conditions post-extraction
  • Coastal and wetland buffer compliance given proximity to sensitive marine sediment systems
  • Agricultural lime supply chain supports regional soil carbon sequestration programs — an indirect ESG value proposition for downstream buyers
  • Potential alignment with WA Government's regional decarbonisation and food security frameworks
Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Shark Bay Shell Grit.
Get listed