REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · CONSTRUCTION MATERIALS, LIMESTONE - LIMESAND

Shark Bay Salt

TYPE · Open Cut / Quarry (Limestone - Limesand) REGION · Gascoyne
01

Operation Details

Commodity
Construction Materials, Limestone - Limesand
Type
Open Cut / Quarry (Limestone - Limesand)
Region
Gascoyne
District
Gascoyne M.F.
Latitude
-26.113456
Longitude
113.659519
02

Project Logistics & B2B Overview

Geographic Location and Topography

Shark Bay Rock is situated within the Gascoyne region of Western Australia, a coastal-arid zone characterized by low-relief limestone plateaus and aeolian sand deposits. The flat to gently undulating terrain typical of the Shark Bay World Heritage Area periphery facilitates bulk earthmoving operations with minimal overburden complexity. However, proximity to sensitive coastal geomorphology imposes strict spatial constraints on extraction footprint expansion, directly influencing bench design and haul road alignment for mass movement efficiency.

B2B Operational Cycle and Logistics

Operating in a remote Gascoyne setting, this site presents significant FIFO roster management challenges given the distance from Carnarvon (~900 km north of Perth). Workforce mobilization relies on Carnarvon Airport as the primary FIFO hub. Key B2B operational considerations include:

  • Rotational rosters typically structured on 2:1 or 8:6 cycles
  • Camp self-sufficiency requirements for water, power, and catering
  • Supply chain dependency on North West Coastal Highway for consumables
  • Limited local contractor pool, increasing reliance on Perth-based vendors

Extraction Engineering and Processing Infrastructure

Limesand and limestone extraction at Shark Bay Rock operates via open-cut quarry methodology, with primary crushing circuits adapted to the low-hardness, high-calcium carbonate matrix typical of Gascoyne coastal formations. Key engineering parameters include:

  • Primary jaw or impact crusher sizing for sub-75mm product gradation
  • Screening circuits for construction-grade aggregate and road base specification
  • Dust suppression systems critical given arid wind exposure
  • No flotation circuit required — physical separation governs product quality

ESG, Value Chain and Sustainability

Operations adjacent to the Shark Bay World Heritage Area impose elevated ESG obligations under both State and Commonwealth environmental frameworks. B2B procurement partners must verify:

  • Compliance with Aboriginal Heritage Act 1972 (WA) and ATSIHP Act 2021
  • Environmental licensing under DWER with strict groundwater and coastal buffer conditions
  • Preferred supplier alignment with Malgana and Yingkarta Traditional Owner groups
  • Rehabilitation bond obligations and progressive landform restoration commitments
Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Shark Bay Salt.
Get listed