REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · SALT

Shark Bay Salt

OPERATOR · Shark Bay Salt Pty Ltd (subsidiary of Mitsui & Co. Ltd.) TYPE · Solar evaporation salt harvesting via concentrator pond cascade system REGION · Gascoyne
01

Operation Details

Operator
Shark Bay Salt Pty Ltd (subsidiary of Mitsui & Co. Ltd.)
Commodity
Salt
Type
Solar evaporation salt harvesting via concentrator pond cascade system
Region
Gascoyne
District
Gascoyne M.F.
Latitude
-26.157671
Longitude
113.402465
02

Compliance & B2B Logistics

Access Logistics & DIDO

DIDO/FIFO rotational rosters via Shark Bay region access corridors; primary road access via Useless Loop Road off North West Coastal Highway (approx. 130 km from Denham); no commercial air strip confirmed for scheduled FIFO operations

Camp Facilities & Telecom

Useless Loop company township provides permanent residential and operational support infrastructure; Telstra network coverage limited — remote satellite communications likely supplementary
03

Project Logistics & B2B Overview

Geographic Location and Topography

The Useless Loop Salt Concentrator Ponds are situated on the western coast of the Peron Peninsula within the Shark Bay World Heritage Area, Gascoyne region, Western Australia. The terrain is characterised by extremely flat, low-lying coastal plains and tidal flats — ideal for large-scale solar evaporation pond engineering. This near-zero gradient topography eliminates major earthmoving challenges but demands precise bund construction and hydraulic gradient management across extensive pond networks to control brine flow by gravity.

B2B Lifecycle and Operational Cycle

The operation is in a sustained production phase, supplying high-purity sodium chloride to export markets, primarily Japan via Mitsui & Co. networks. The remote location of Useless Loop township drives a structured FIFO/DIDO roster model, with personnel cycling through the self-contained company town. B2B vendors supplying maintenance, harvesting equipment, and logistics services must account for long lead times, limited local supply chain depth, and strict site induction protocols aligned with Mitsui's corporate HSE framework.

Engineering and Extraction Infrastructure

The production circuit relies on a multi-stage solar evaporation cascade: seawater is progressively concentrated through a series of concentrator and crystalliser ponds before mechanical harvesting. Key engineering demands include:

  • Brine density management (Baumé-scale monitoring) across pond stages
  • Heavy-duty salt harvesting machinery (scrapers, conveyors, wash plants)
  • Wash and stockpile facilities for export-grade NaCl specification compliance
  • Marine loading infrastructure at Useless Loop jetty for bulk vessel export

No conventional grinding or flotation circuits apply; process control is physicochemical and hydraulic.

ESG, Value Chain and Sustainability

Operating within the Shark Bay UNESCO World Heritage Area imposes stringent environmental compliance obligations, including protection of stromatolites, seagrass ecosystems, and marine biodiversity. B2B contractors must demonstrate:

  • Adherence to Heritage Act (WA) and EPBC Act environmental conditions
  • Culturally sensitive engagement with Malgana Aboriginal traditional custodians
  • Preference frameworks for Aboriginal-owned enterprise participation in supply contracts
  • Zero-discharge brine management and minimal footprint expansion commitments

Mitsui's global ESG reporting integrates site-level biodiversity KPIs into corporate sustainability disclosures.

Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Shark Bay Salt.
Get listed