REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · TIN - TANTALUM - LITHIUM

Pilgangoora Operation

OPERATOR · Pilbara Minerals Ltd. (ASX: PLS) — Pilgangoora Operations Pty Ltd. TYPE · Open-cut hard rock mining — Spodumene (Lithium), Tantalite, Cassiterite (Tin) REGION · Pilbara
01

Operation Details

Operator
Pilbara Minerals Ltd. (ASX: PLS) — Pilgangoora Operations Pty Ltd.
Commodity
Tin - Tantalum - Lithium
Type
Open-cut hard rock mining — Spodumene (Lithium), Tantalite, Cassiterite (Tin)
Region
Pilbara
District
Marble Bar
Latitude
-21.066067
Longitude
118.90552
02

Compliance & B2B Logistics

Access Logistics & DIDO

FIFO via Port Hedland Airport; haul road to Port Hedland export terminal (~100 km north); concentrate transport by road train

Camp Facilities & Telecom

Permanent on-site accommodation village; Telstra network coverage (remote Pilbara zone)
03

Project Logistics & B2B Overview

Geographic Location and Topography

Pilgangoora is situated approximately 120 km south of Port Hedland, within the Marble Bar district of the Pilbara region, Western Australia. The terrain is characterised by extreme arid conditions — annual rainfall below 300 mm, ambient temperatures exceeding 45°C in summer, and high evaporation rates. Water supply is operationally critical: the site relies on licensed groundwater extraction and managed water recycling circuits. Any B2B vendor operating on-site must account for dust suppression, dewatering logistics, and heat-load management as baseline operational requirements.

B2B Lifecycle and Operational Status

Pilgangoora is a fully operating, large-scale lithium-tantalum operation under 100% ownership by Pilbara Minerals Ltd. The project has undergone staged expansions (P680, P1000 modules), targeting nameplate spodumene concentrate output exceeding 1 Mtpa. Local mechanical workshop capacity is a critical procurement gap — mobile equipment downtime in this remote corridor carries severe cost penalties. B2B suppliers offering on-site MARC (Maintenance and Repair Contracts), mobile crane services, and hydraulic component exchange programs hold strong commercial positioning at this operation.

Extraction Engineering and Processing Infrastructure

The processing plant integrates a primary crushing and SAG/ball mill grinding circuit feeding dense media separation (DMS) and froth flotation modules. Spodumene recovery demands precise pulp density control, reagent dosing (collectors, frothers), and tight particle size distribution management. The flotation circuit operates under high physical-chemical stress, requiring scheduled liner replacements, pump impeller audits, and reagent supply chain continuity. Tantalite and cassiterite are recovered via gravity concentration as by-products. Vendors supplying mill liners, hydrocyclones, and process instrumentation face strong recurring demand.

ESG, Value Chain and Sustainability

Pilbara Minerals maintains active Aboriginal Heritage compliance obligations under the WA Aboriginal Heritage Act, with registered agreements covering Njamal and Kariyarra country. B2B procurement strategy increasingly prioritises Indigenous Business Australia-certified suppliers and local Pilbara Aboriginal enterprises for civil works, catering, and environmental monitoring contracts. ESG reporting aligns with GRI Standards and ASX Corporate Governance Principles. Vendors seeking preferred supplier status must demonstrate cultural awareness training, heritage survey protocols, and documented community benefit contributions as part of their tender submissions.

Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Pilgangoora Operation.
Get listed