REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · GOLD

Never Never

OPERATOR · Ramelius Resources Limited TYPE · None REGION · Mid-West
01

Operation Details

Operator
Ramelius Resources Limited
Commodity
Gold
Type
None
Region
Mid-West
District
Yalgoo M.F.
Latitude
-27.842871
Longitude
117.269047
02

Compliance & B2B Logistics

HSE & Site Induction

Work Health and Safety Act 2020 (WA); Work Health and Safety (Mines) Regulations 2022 (WA); Regulator: WorkSafe WA

Access Logistics & DIDO

FIFO/DIDO via Perth — Yalgoo Municipal Function area, Mid-West Region WA; road access via Great Northern Highway corridor; nearest regional hub: Geraldton (~250 km SW of Yalgoo)

Camp Facilities & Telecom

None
03

Project Logistics & B2B Overview

Geographic Location and Topography

The Never Never gold project is situated within the Yalgoo Mineral Field, Mid-West Region of Western Australia, approximately 500 km north-northeast of Perth. This remote positioning creates extended supply chain lead times for consumables, equipment, and personnel. Geraldton serves as the nearest logistics staging point, making freight consolidation and regional warehousing critical considerations for any vendor or contractor engaging with this site. Terrain is characterised by semi-arid, low-relief Yilgarn Craton geology typical of the broader Murchison goldfield corridor.

B2B Lifecycle and Operations

Never Never is currently in the development and construction phase, operated by Ramelius Resources Limited (ASX: RMS). This stage drives immediate procurement demand across:

  • Civil earthworks and site establishment contracting
  • Portal and decline construction services
  • Temporary and permanent site infrastructure installation
  • Geotechnical investigation and drilling services
  • Camp, water, and power infrastructure mobilisation

Vendors should engage early; development-phase procurement windows are time-critical and typically favour pre-qualified suppliers.

Extraction Engineering and Infrastructure

Given the gold mineralisation style typical of the Yilgarn Craton, underground extraction methodology is the anticipated primary development pathway. Key engineering focus areas at this stage include:

  • Primary ventilation system design and installation for underground workings
  • Ground support programmes — rock bolting, mesh, and shotcrete supply
  • Dewatering and humidity management infrastructure
  • Decline development and materials handling systems
  • Underground electrical reticulation and communications

Processing circuit type has not been publicly confirmed at this stage; infrastructure categorisation should be treated as development-phase only.

ESG, Value Chain and Sustainability

Ramelius Resources operates under WorkSafe WA oversight, with site obligations governed by the Work Health and Safety Act 2020 (WA) and the Work Health and Safety (Mines) Regulations 2022 (WA). ESG commitments at development stage centre on:

  • Early-stage tailings storage facility planning and engineered containment design
  • Progressive rehabilitation planning integrated into the construction programme
  • Dust, noise, and groundwater baseline monitoring
  • FIFO workforce model minimising permanent regional footprint

Proactive rehabilitation scheduling from the outset reduces long-term closure liability and aligns with Ramelius's corporate sustainability reporting obligations.

Profile last updated · 13 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Never Never.
Get listed