REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · LIMESTONE - LIMESAND

Mt Alexander

TYPE · Open Cut / Quarry — Limestone and Limesand extraction REGION · Goldfields-Esperance
01

Operation Details

Commodity
Limestone - Limesand
Type
Open Cut / Quarry — Limestone and Limesand extraction
Region
Goldfields-Esperance
District
Dundas M.F.
Latitude
-33.832245
Longitude
122.768778
02

Project Logistics & B2B Overview

Geographic Location and Topography

Alexander Howick is situated within the Dundas Mineral Field, Goldfields-Esperance Region, Western Australia — one of the continent's most climatically hostile operating zones. The terrain is characterised by semi-arid to arid scrubland, shallow calcrete plains, and extreme diurnal temperature variance. Annual rainfall is critically low, making water supply infrastructure a primary operational constraint. Site access relies on unsealed or partially sealed regional roads, exposing heavy haulage to seasonal degradation and dust suppression requirements year-round.

B2B Lifecycle and Operations

The site holds Operating status, indicating active extraction of limestone and limesand commodities. Given the remoteness of the Dundas M.F., workforce deployment is structurally dependent on FIFO rotational rosters, with personnel cycling through regional hubs such as Norseman or Esperance. No confirmed operator or corporate entity has been publicly indexed, limiting direct vendor engagement pathways. Camp and accommodation logistics must be self-contained, requiring:

  • Potable water cartage or on-site bore infrastructure
  • Diesel-powered generation for site power
  • Modular camp units with HVAC rated for extreme heat
  • Emergency medical evacuation protocols to nearest regional centre

Engineering and Extraction Infrastructure

Limestone and limesand operations at this scale typically deploy drill-and-blast or rip-and-push open cut methodology, followed by primary crushing circuits. Limesand extraction may involve direct load-and-haul without blasting, depending on deposit competency. Key engineering considerations include:

  • Primary jaw or impact crusher for limestone sizing
  • Screening decks for limesand particle classification
  • Dust suppression systems compliant with WA DMIRS standards
  • Haul road compaction and grade management for loaded truck cycles
  • Stockpile management to prevent moisture loss in arid conditions

ESG, Value Chain and Sustainability

Limestone and limesand supply chains in the Goldfields-Esperance corridor serve critical downstream uses including agricultural lime, road base, and neutralisation reagents for nearby gold processing operations. ESG exposure at remote quarry sites increasingly demands:

  • Rehabilitation bonds and progressive land restoration under WA Mining Act 1978
  • Dust and noise monitoring aligned with ESG reporting frameworks
  • Evaluation of solar-hybrid power to reduce diesel dependency
  • Water recycling protocols to minimise groundwater drawdown
  • Biodiversity offset assessments for semi-arid scrubland disturbance
Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Mt Alexander.
Get listed