REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · HEAVY MINERAL SANDS

Mount Weld

TYPE · Heavy Mineral Sands (Dredge / Dry Mining) REGION · Mid-West
01

Operation Details

Commodity
Heavy Mineral Sands
Type
Heavy Mineral Sands (Dredge / Dry Mining)
Region
Mid-West
District
South West M.F.
Latitude
-28.172306
Longitude
114.27721
02

Project Logistics & B2B Overview

Geographic Location and Topography

The Lynton deposit is situated within the Mid-West region of Western Australia, a coastal-to-inland transition zone characterised by low-relief aeolian dune systems and palaeochannel stratigraphy. The flat to gently undulating terrain facilitates bulk earthmoving operations with minimal blasting requirements. Shallow overburden profiles typical of HMS deposits in this corridor allow high-efficiency strip mining, though seasonal wind erosion and loose unconsolidated sands demand robust dust suppression and geotechnical monitoring protocols across the active mining footprint.

B2B Lifecycle and Operational Framework

As an operating asset, Lynton demands structured vendor engagement across consumables, mobile plant maintenance, and site services. Given the regional remoteness, workforce deployment relies on FIFO/DIDO rotational rosters from Geraldton or Perth as primary mobilisation hubs. Camp infrastructure must sustain continuous operations, covering catering, medical, telecommunications (Telstra network dependency), and fatigue management systems. B2B suppliers should anticipate:

  • Scheduled maintenance windows for wet concentrator plant (WCP)
  • Reagent and consumable replenishment cycles
  • Light and heavy vehicle fleet support contracts
  • Camp facilities management and laundry/catering services

Extraction Engineering and Processing Infrastructure

Heavy mineral sands extraction at Lynton centres on a wet concentrator plant (WCP) processing slurried feed to produce a heavy mineral concentrate (HMC). The circuit typically integrates:

  • Spiral classifier banks for primary gravity separation
  • Hydrocyclone desliming ahead of concentration
  • Magnetic and electrostatic separation for mineral suite isolation (ilmenite, rutile, zircon)
  • Tailings thickening and return water recovery systems

Physicochemical control of slurry density, pH, and particle size distribution is critical to maximise HMC grade and recovery efficiency.

ESG, Value Chain and Sustainability

HMS operations in WA's Mid-West are subject to DMP/DMIRS rehabilitation bonds and progressive mine closure obligations. Lynton's ESG framework must address:

  • Tailings storage facility (TSF) design, monitoring, and ANCOLD compliance
  • Progressive topsoil stripping, stockpiling, and landform reconstruction
  • Native vegetation clearing offsets and fauna corridor preservation
  • Water balance management in a semi-arid catchment
  • Community and Traditional Owner engagement under WA's Aboriginal Heritage Act

Proactive rehabilitation directly impacts social licence continuity and long-term operational tenure.

Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Mount Weld.
Get listed