REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · GOLD

Morrison

REGION · Goldfields-Esperance
01

Operation Details

Commodity
Gold
Region
Goldfields-Esperance
District
East Coolgardie
Latitude
-30.789471
Longitude
121.508476
02

Project Logistics & B2B Overview

Geographic Location and Topography

The Morrison Gold Mine is situated within the East Coolgardie Goldfield, one of Western Australia's most prolific auriferous corridors in the Goldfields-Esperance Region. The terrain is characterised by flat to undulating semi-arid scrubland, with extreme arid conditions imposing critical constraints on water sourcing. Operational water supply — whether through licensed borefield extraction, recycled process water, or haulage — remains a primary survival variable for any sustained mining campaign in this hyper-evaporative environment.

B2B Life Cycle and Operations

As an operating asset, Morrison demands continuous 24/7 operational throughput, driving relentless diesel consumption across mobile fleets including drill rigs, excavators, and haul trucks. Power infrastructure dependency is critical; diesel gensets or grid-tied substations underpin processing and ancillary systems. B2B vendors supplying fuel logistics, electrical switchgear, and preventive maintenance contracts hold strategic positions within this supply chain. Operational continuity KPIs govern all contractor SLAs on site.

Engineering and Extraction Infrastructure

Material handling at Morrison relies on engineered conveyor systems to transfer ROM ore from the primary crusher to downstream processing circuits, minimising truck re-handle and optimising throughput efficiency. Infrastructure typically includes:

  • Belt conveyor networks linking crushing, screening, and milling stages
  • Primary jaw or gyratory crushing units
  • CIL/CIP gold recovery circuits
  • Tailings storage facility (TSF) with liner compliance
  • On-site laboratory for metallurgical sampling and grade control

ESG, Value Chain and Sustainability

Operating within the Goldfields-Esperance Region mandates strict Aboriginal Heritage compliance under the WA Aboriginal Heritage Act, requiring Section 18 consents and ongoing ethnographic survey obligations. B2B procurement strategies increasingly prioritise:

  • Engagement with Aboriginal-owned enterprises for civil, catering, and labour hire
  • Dust suppression and water recycling programs to meet DER licence conditions
  • Carbon reporting aligned with TCFD frameworks
  • Rehabilitation bonding and progressive land restoration commitments
Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Morrison.
Get listed