REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · GOLD

Lucky Strike Gold Mine

OPERATOR · Lefroy Exploration Limited TYPE · Open Pit (Gold) REGION · Goldfields-Esperance
01

Operation Details

Operator
Lefroy Exploration Limited
Commodity
Gold
Type
Open Pit (Gold)
Region
Goldfields-Esperance
District
Bulong
Latitude
-31.127757
Longitude
121.991
02

Compliance & B2B Logistics

HSE & Site Induction

WorkSafe WA — Work Health and Safety Act 2020 (WA); Work Health and Safety (Mines) Regulations 2022 (WA)

Access Logistics & DIDO

FIFO/DIDO rotation via Kalgoorlie-Boulder (approx. 25 km west of Bulong); ore haulage by road to contract milling facility in Coolgardie

Camp Facilities & Telecom

None
03

Project Logistics & B2B Overview

Geographic Location and Topography

Lucky Strike Gold Mine is located in the Bulong district, approximately 25 km east of Kalgoorlie-Boulder within the Goldfields-Esperance region of Western Australia. The site sits within the Eastern Goldfields Superterrane, characterised by semi-arid, flat-to-undulating terrain. Ambient temperatures routinely exceed 45 °C in summer, imposing severe thermal stress on hydraulic systems, engine cooling circuits, and lubricants across all heavy equipment. Vendors supplying to this site must engineer heat-management solutions as a baseline requirement, not an option.

  • Elevation: low-relief lateritic plateau typical of the Yilgarn Craton
  • Climate hazard: extreme radiant heat, dust, and episodic high-wind events
  • Nearest logistics hub: Kalgoorlie-Boulder (sealed road access)

B2B Lifecycle and Operations

Operated by Lefroy Exploration Limited (ASX: LEX), Lucky Strike is an actively producing open-pit gold asset that commenced ore extraction in late 2025, with initial gold doré achieved in early 2026 via contract milling. The operation relies on contract processing arrangements, creating recurring procurement cycles for haulage, reagent supply, and laboratory services. The absence of on-site processing infrastructure elevates the criticality of mobile plant uptime: any mechanical downtime directly delays ore delivery and cash flow.

  • Service categories in demand: open-pit mining contracting, drill-and-blast, grade control drilling
  • Processing model: toll/contract milling — ongoing capacity negotiation active
  • B2B priority: rapid-response mechanical workshops within the Kalgoorlie corridor

Extraction Engineering and Infrastructure

The open-pit extraction method subjects the heavy mobile equipment fleet — including haul trucks and front-end loaders in the Cat/Komatsu class — to accelerated wear cycles driven by abrasive lateritic and fresh-rock ore. In the Goldfields heat envelope, GET (Ground Engaging Tools), brake linings, tyre sidewalls, and hydraulic seals degrade at rates 20–30% above temperate-climate benchmarks. Local suppliers capable of same-day parts availability for high-wear consumables hold a decisive competitive advantage.

  • Critical wear items: GET, haul truck liners, hydraulic hoses, cooling system components
  • Infrastructure: run-of-mine pad, ROM stockpile management, road haulage to off-site mill
  • Power and water: remote site — auxiliary generation and water cartage required

ESG, Value Chain and Sustainability

Operations at Lucky Strike are governed by the Work Health and Safety (Mines) Regulations 2022 (WA), administered by WorkSafe WA. As an open-pit gold operation in a water-scarce environment, tailings storage facility (TSF) design, liner integrity monitoring, and progressive rehabilitation are non-negotiable ESG obligations. Lefroy Exploration is accountable for mine closure planning and concurrent rehabilitation under Western Australian regulatory frameworks, requiring vendors in civil earthworks, environmental monitoring, and revegetation to maintain pre-qualified status.

  • Regulatory body: WorkSafe WA (WHS Act 2020 and WHS (Mines) Regulations 2022)
  • ESG focus areas: TSF containment, dust suppression, groundwater monitoring, land rehabilitation
  • Procurement angle: environmental services, closure-bond-compliant earthworks, water management
Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Lucky Strike Gold Mine.
Get listed