REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · GYPSUM

Lake Goorly Gypsum Mine

OPERATOR · Lake Goorly Contracting (LGC) — formerly Bywaters Gypsum Supplies; owner-operated by Craig and Phillip Bywaters. TYPE · Open-cut surface mining (gypsum evaporite extraction from playa lake deposit). REGION · Wheatbelt
01

Operation Details

Operator
Lake Goorly Contracting (LGC) — formerly Bywaters Gypsum Supplies; owner-operated by Craig and Phillip Bywaters.
Commodity
Gypsum
Type
Open-cut surface mining (gypsum evaporite extraction from playa lake deposit).
Region
Wheatbelt
District
South West M.F.
Latitude
-29.954852
Longitude
116.984593
02

Compliance & B2B Logistics

Access Logistics & DIDO

Road haulage via Great Northern Highway corridor; approx. 280–300 km northeast of Perth CBD — no FIFO/DIDO air roster confirmed for this scale of operation.
03

Project Logistics & B2B Overview

Geographic Location and Topography

Lake Goorly is situated within the Wheatbelt region of Western Australia, approximately 280–300 km northeast of Perth, near the township of Kalannie. The deposit occupies a shallow playa lake system — a classic evaporite environment characteristic of the WA inland plateau. This remote positioning creates extended supply chain lead times for consumables, mechanical parts, and specialist labour, placing acute pressure on procurement planning and inventory buffering at site level.

B2B Lifecycle and Operational Profile

LGC operates as a owner-operator SME, extracting and supplying agricultural-grade gypsum to the broadacre farming sector across WA. The operational model is lean and logistics-dependent. Key B2B considerations include:

  • Local mechanical workshop access is critical — nearest heavy equipment service centres are in Dalwallinu or Moora, 80–120 km away.
  • Unplanned downtime on scrapers or haul trucks carries disproportionate cost at this scale.
  • Seasonal extraction windows align with dry-season lake bed conditions (typically April–October).

Extraction Engineering and Infrastructure

Gypsum extraction at Lake Goorly follows a surface scraper and bulk-load methodology — no conventional drill-and-blast circuit. Processing is minimal: primary crushing and screening to achieve agricultural particle size specification. Unlike sulphide operations, there is no flotation plant or reagent circuit. Infrastructure demands centre on:

  • Grader and scraper fleet maintenance under abrasive saline conditions.
  • Stockpile management on lake-edge hardstand.
  • Road-train loading and dispatch logistics to farm-gate customers.

ESG, Value Chain and Sustainability

As a playa lake evaporite operation, Lake Goorly presents a low-disturbance extraction profile relative to hard-rock mining. No conventional tailings storage facility (TSF) is required. ESG obligations focus on:

  • Progressive rehabilitation of scraped lake-bed surfaces per DMP/DMIRS tenure conditions.
  • Dust suppression management across exposed lake sediments.
  • Hydrological integrity of the playa system post-extraction.
  • Compliance with WA Mining Act 1978 small-operator rehabilitation bond requirements.
Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Lake Goorly Gypsum Mine.
Get listed