REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · GOLD

Karari Gold Mine

OPERATOR · Northern Star Resources Ltd (via Northern Star (Carosue Dam) Pty Ltd) TYPE · Underground decline-based gold extraction (Main Decline + Exploration Decline development) REGION · Goldfields-Esperance
01

Operation Details

Operator
Northern Star Resources Ltd (via Northern Star (Carosue Dam) Pty Ltd)
Commodity
Gold
Type
Underground decline-based gold extraction (Main Decline + Exploration Decline development)
Region
Goldfields-Esperance
District
Kurnalpi
Latitude
-30.159159
Longitude
122.359244
02

Compliance & B2B Logistics

HSE & Site Induction

Northern Star Resources HSE Framework — compliant with WA Mines Safety and Inspection Act 1994 and NSW/WA dual-jurisdiction standards

Access Logistics & DIDO

DIDO/FIFO rotations via Kalgoorlie-Boulder Airport (KGI) — site access via Great Eastern Highway corridor; Kurnalpi sector ~100 km NE of Kalgoorlie

Camp Facilities & Telecom

Carosue Dam Operations Village — Telstra NextG coverage zone; camp facilities integrated within broader Carosue Dam infrastructure hub
03

Project Logistics & B2B Overview

Geographic Location and Topography

Karari Main And Exploration Declines is situated within the Kurnalpi greenstone belt, approximately 100 km northeast of Kalgoorlie in the Goldfields-Esperance Region of Western Australia. The terrain is characterised by flat to undulating semi-arid landscape with red ferruginous soils generating extreme fine-dust (red dirt) conditions. This environment imposes severe abrasion loads on all surface and portal-level mechanical assets, driving acute demand for high-grade filtration systems, dust suppression infrastructure, and accelerated wear-part replacement cycles across all mobile and fixed plant.

B2B Lifecycle and Operational Status

Currently classified as Operating, Karari functions as an active underground gold producer integrated into Northern Star's Carosue Dam Operations hub. The dual-decline configuration — Main Production Decline and Exploration Decline — enables simultaneous ore extraction and resource extension drilling. B2B vendors must account for:

  • Continuous decline development requiring ground support consumables (mesh, bolts, shotcrete)
  • High-frequency demand for underground mobile fleet servicing
  • Local mechanical workshop capability to minimise unplanned downtime and avoid costly fly-in component logistics
  • Integrated scheduling within Carosue Dam's multi-pit and multi-decline production calendar

Extraction Engineering and Processing Infrastructure

Ore extracted from Karari declines feeds into the Carosue Dam processing plant, which operates a conventional CIL (Carbon-in-Leach) circuit. Key engineering demand nodes include:

  • Primary grinding circuit: SAG and ball mill assemblies with high liner wear rates driven by abrasive greenstone ore
  • Flotation and gravity concentration pre-treatment stages with stringent physico-chemical reagent control
  • Decline ventilation systems requiring robust fan assemblies and ducting rated for fine-particulate environments
  • Paste fill or cemented aggregate fill (CAF) reticulation for void management in stoped areas

Suppliers of mill liners, reagents, and ventilation equipment hold strategic positioning at this operation.

ESG, Value Chain and Sustainability

Northern Star Resources operates under a formal Reconciliation Action Plan (RAP), making Heritage compliance and Indigenous engagement non-negotiable procurement criteria in the Kurnalpi corridor. B2B priorities include:

  • Mandatory Aboriginal Heritage surveys prior to any new decline or surface disturbance footprint
  • Preferential procurement alignment with Wangkatha and Ngadju Country Traditional Owner enterprises
  • Water management obligations under WA Department of Water and Environmental Regulation (DWER) licensing
  • Carbon reporting integration within Northern Star's Scope 1 & 2 emissions reduction roadmap to 2030

Vendors offering Indigenous-partnered service models gain measurable competitive advantage in tender evaluation at this site.

Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Karari Gold Mine.
Get listed