REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · IRON ORE

Jimblebar Mine

OPERATOR · BHP Iron Ore Pty Ltd (JV: BHP 85% / ITOCHU Minerals & Energy of Australia 8% / Mitsui & Co. Iron Ore Exploration & Mining 7%) TYPE · Open Cut / Open Pit Iron Ore Mining REGION · Pilbara
01

Operation Details

Operator
BHP Iron Ore Pty Ltd (JV: BHP 85% / ITOCHU Minerals & Energy of Australia 8% / Mitsui & Co. Iron Ore Exploration & Mining 7%)
Commodity
Iron Ore
Type
Open Cut / Open Pit Iron Ore Mining
Region
Pilbara
District
Peak Hill M.F.
Latitude
-23.380316
Longitude
120.13711
02

Compliance & B2B Logistics

HSE & Site Induction

BHP Global HSE Framework — Zero Harm Policy, site-specific Dust & Silica Exposure Management Plan, mandatory MSDS compliance for all contractors operating on-site.

Access Logistics & DIDO

FIFO operations via Newman Airport (NPM); primary haul corridor via Great Northern Highway; rail integration via BHP's Newman–Port Hedland iron ore railway (approx. 426 km to Port Hedland export terminal).

Camp Facilities & Telecom

Telstra network coverage (4G/LTE) via Newman township infrastructure; FIFO workforce accommodated at BHP-managed Newman residential village and on-site camp facilities.
03

Project Logistics & B2B Overview

Geographic Location and Topography

Jimblebar Iron Ore is situated approximately 45 km east of Newman in the Pilbara region of Western Australia, within the Peak Hill Mineral Field. The terrain is characterised by ancient Precambrian banded iron formations (BIF), extreme thermal amplitude, and pervasive red fine-dust (red dirt) conditions. Abrasive particulate matter accelerates wear rates across conveyor systems, crusher liners, and mobile fleet components. Vendors supplying filtration systems, dust suppression units, and high-abrasion-resistant wear parts face consistent, high-volume demand across all operational phases.

B2B Lifecycle and Operational Continuity

Jimblebar operates on a 24/7 continuous production cycle, sustaining one of BHP's highest-throughput iron ore hubs in the Pilbara. Operational continuity depends on uninterrupted diesel fuel supply chains powering the heavy mobile fleet — including Caterpillar 793 and Komatsu 930E haul trucks — alongside dedicated high-voltage substation infrastructure feeding fixed plant operations. Fuel logistics, generator redundancy, and electrical switchgear maintenance represent critical B2B procurement categories. FIFO rotational workforce is managed through Newman Airport, with camp and catering services contracted externally.

Extraction Engineering and Infrastructure

The processing circuit at Jimblebar integrates primary crushing stations, coarse ore stockpiles, and a dry screening beneficiation plant optimised for direct-shipping ore (DSO) grades. Unlike sulphide operations, the physico-chemical demands here centre on high-tonnage screening efficiency, dust-sealed transfer chutes, and magnetic separation circuits for low-grade ore upgrading. Structural steel, screen media (polyurethane and wire), and precision-engineered conveyor pulleys are subject to accelerated replacement cycles due to abrasive BIF ore characteristics. Engineering vendors must comply with BHP's Global Supplier Requirements and site-specific mechanical standards.

ESG, Value Chain and Sustainability

BHP's Jimblebar operation adheres to rigorous tailings storage facility (TSF) management protocols aligned with the Global Industry Standard on Tailings Management (GISTM). Progressive land rehabilitation and native vegetation restoration programs are embedded in the mine closure plan. Water recycling within the processing plant minimises freshwater draw from the Fortescue River catchment. The JV structure — incorporating ITOCHU and Mitsui — reinforces ESG reporting obligations under both Australian and Japanese regulatory frameworks, elevating transparency standards for all Tier-1 and Tier-2 suppliers engaged on-site.

Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.

Procurement

B2B Services Available at this Mine

Specialist contractors and suppliers operating across this mine site.

Supplier?
Serve Jimblebar Mine.
Get listed