REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · GOLD

Dolly Pot

OPERATOR · EDNA MAY OPERATIONS PTY LTD (prev. MARDA OPERATIONS PTY LTD) TYPE · Gold (Open Pit / Hard Rock) REGION · Wheatbelt
01

Operation Details

Operator
EDNA MAY OPERATIONS PTY LTD (prev. MARDA OPERATIONS PTY LTD)
Commodity
Gold
Type
Gold (Open Pit / Hard Rock)
Region
Wheatbelt
District
Yilgarn M.F.
Latitude
-30.197576
Longitude
119.258708
02

Compliance & B2B Logistics

Access Logistics & DIDO

FIFO/DIDO rotational rosters via Perth hub; regional access via Great Eastern Highway corridor to Yilgarn goldfields district
03

Project Logistics & B2B Overview

Geographic Location and Topography

The Dolly Pot mine is situated within the Yilgarn Mineral Field, Wheatbelt Region of Western Australia — a laterite-dominated, low-relief Archean craton surface. The subdued topography, characterised by shallow regolith profiles and calcrete hardpan, directly conditions earthmoving strategy. Bulk dozing and ripping campaigns must account for variable saprolite depth before reaching competent fresh rock. Drainage management across the flat terrain is a critical civil engineering consideration during seasonal rainfall events impacting open-cut bench stability.

B2B Lifecycle and Operational Status

The asset transitioned operatorship from MARDA OPERATIONS PTY LTD (ceased 30 March 2024) to EDNA MAY OPERATIONS PTY LTD, a Ramelius Resources subsidiary, with the most recent operational period recorded to 29 April 2025. This succession signals active portfolio consolidation within Ramelius's Yilgarn corridor strategy. B2B vendors should note:

  • Operator change creates re-tendering windows for services and supply contracts
  • Alignment with Ramelius Resources' group procurement frameworks is mandatory
  • Contact escalation routes through East Perth corporate HQ are confirmed active

Engineering and Extraction Infrastructure

Gold extraction in the Yilgarn MF typically integrates open-pit drill-and-blast with CIL/CIP processing circuits. Material handling relies on conveyor systems engineered for high-tonnage throughput across flat terrain, minimising truck haulage cycle times. Key infrastructure considerations include:

  • Overland conveyors linking pit ROM pads to primary crushing stations
  • Scalper and screen decks managing laterite fines separation pre-mill
  • Reagent storage and tailings storage facility (TSF) civil compliance under DMIRS regulation
  • Backup diesel generation supporting process continuity in grid-remote conditions

ESG, Value Chain and Sustainability

Operating within the Yilgarn MF requires strict adherence to Aboriginal Heritage Act 1972 (WA) obligations, now reinforced by the Aboriginal Cultural Heritage Act 2021 framework. Ramelius Resources' ESG commitments drive vendor selection criteria. Priority areas include:

  • Mandatory Heritage surveys and Section 18 consent management pre-disturbance
  • Preferred supplier status for Aboriginal-owned enterprises under Reconciliation Action Plan (RAP) targets
  • Progressive rehabilitation bonding and native vegetation offset compliance
  • Water management plans aligned with DWER licensing conditions
Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Dolly Pot.
Get listed