REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · GYPSUM

Cowcowing Gypsum Mine

OPERATOR · Gypsum Supplies / Lake Hillman Mining Pty Ltd / Gypsum Industries TYPE · Open-cut surface mining (gypsum evaporite extraction) REGION · Wheatbelt
01

Operation Details

Operator
Gypsum Supplies / Lake Hillman Mining Pty Ltd / Gypsum Industries
Commodity
Gypsum
Type
Open-cut surface mining (gypsum evaporite extraction)
Region
Wheatbelt
District
South West M.F.
Latitude
-30.941645
Longitude
117.386845
02

Compliance & B2B Logistics

Access Logistics & DIDO

Road haulage via Great Northern Highway and regional Wheatbelt road network; DIDO operations from Kalannie and Wyalkatchem service hubs
03

Project Logistics & B2B Overview

Geographic Location and Topography

The Dukin-Lake Cowcowing operation sits within the Wheatbelt region of Western Australia, characterised by flat to gently undulating paleolake terrain typical of ancient evaporite basins. The low-relief topography minimises overburden stripping ratios, reducing earthmoving cycle times significantly. Shallow water tables and seasonally inundated lake beds demand precise site drainage engineering. The flat terrain, however, facilitates efficient haul road layouts and streamlines bulk material movement across the extraction footprint.

B2B Operational Cycle and Commercial Activity

As an operating asset, Dukin-Lake Cowcowing sustains continuous procurement cycles across:

  • Diesel fuel supply for mobile fleet (scrapers, graders, front-end loaders)
  • Bulk haulage contracting for gypsum transport to agricultural and industrial end-users
  • Maintenance consumables: tyres, hydraulic fluids, wear parts
  • Water management services for dust suppression and site dewatering
  • Weighbridge and load-out infrastructure servicing

Operations are DIDO-based, relying on Kalannie and Wyalkatchem as primary logistics nodes.

Extraction Engineering and Infrastructure

Gypsum extraction at Lake Cowcowing employs shallow open-cut methodology, with mechanical ripping and scraper-based bulk removal replacing conventional drill-and-blast. Key engineering requirements include:

  • Primary crushing and particle size classification for agricultural-grade gypsum (soil amendment)
  • Screening circuits to segregate coarse, medium, and fine fractions
  • Stockpile management for moisture-sensitive evaporite product
  • Mobile plant maintenance under high-dust, high-UV environmental conditions

No flotation circuit is required; product purity is managed through selective mining and mechanical screening alone.

ESG, Value Chain and Sustainability

Agricultural gypsum inherently supports ESG-aligned supply chains by improving soil carbon sequestration capacity and reducing synthetic fertiliser dependency across Wheatbelt farming operations. Operational sustainability priorities include:

  • Diesel consumption reduction via optimised haul cycle planning and fleet right-sizing
  • Progressive land rehabilitation of extracted lake-bed areas per WA DMP requirements
  • Dust suppression protocols to protect local biodiversity corridors
  • Potential integration of solar-assisted site power for auxiliary equipment

Formal ESG reporting frameworks have not been publicly disclosed by current operators.

Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Cowcowing Gypsum Mine.
Get listed