REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · CONSTRUCTION MATERIALS, SILICA - SILICA SAND

Clackline Refractory

REGION · Wheatbelt
01

Operation Details

Commodity
Construction Materials, Silica - Silica Sand
Region
Wheatbelt
District
South West M.F.
Latitude
-31.700042
Longitude
116.502144
02

Project Logistics & B2B Overview

Geographic Location and Topography

Refractory Clackline is situated in the Wheatbelt region of Western Australia, approximately 80–100 km east of Perth via the Great Eastern Highway corridor. This proximity is deceptive operationally: regional road infrastructure degrades rapidly beyond Northam, extending supply chain lead times for consumables, mechanical parts, and specialist contractors. The flat to gently undulating terrain typical of the Wheatbelt facilitates open-cut extraction but offers minimal natural shelter, exposing surface plant to seasonal wind and dust loading.

B2B Lifecycle and Operations

As an operating silica sand quarry classified under Construction Materials, Refractory Clackline demands continuous procurement cycles for wear liners, screening media, and conveyor components. The absence of confirmed operator data creates a vendor engagement gap — a critical opportunity for local mechanical workshops and mobile service providers. Unplanned downtime in single-commodity quarries carries disproportionate revenue impact. B2B suppliers offering rapid-response field service within the Northam–Clackline corridor hold a decisive competitive advantage.

Engineering and Extraction Infrastructure

Silica sand operations at this classification typically deploy a primary crushing and screening circuit with multi-deck vibrating screens to achieve construction-grade particle size distribution. Key engineering demands include:

  • High-wear screening panels resistant to abrasive silica (Mohs 7)
  • Dust suppression systems compliant with silica inhalation thresholds
  • Wash plant or dry classification units for product specification control
  • Haul road compaction management to preserve payload efficiency

Physico-chemical consistency of output is non-negotiable for downstream construction material buyers.

ESG, Value Chain and Sustainability

Wheatbelt quarry operations face mounting pressure to align with Western Australian ESG frameworks and Scope 2 emissions reduction targets. For a site of this scale, viable pathways include:

  • Rooftop or ground-mounted solar PV to offset diesel genset consumption
  • Transition of light vehicle fleet to hybrid or battery-electric units
  • Dust and water management plans tied to environmental licence conditions
  • Progressive rehabilitation bonding aligned with DMP requirements

Demonstrable ESG performance increasingly governs access to construction sector supply contracts in WA.

Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Clackline Refractory.
Get listed