REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · GOLD

Central Norseman Gold Mine

OPERATOR · Pantoro Limited TYPE · Open Pit (Gold) REGION · Goldfields-Esperance
01

Operation Details

Operator
Pantoro Limited
Commodity
Gold
Type
Open Pit (Gold)
Region
Goldfields-Esperance
District
Dundas M.F.
Latitude
-32.123247
Longitude
121.808097
02

Compliance & B2B Logistics

Access Logistics & DIDO

FIFO rotational rosters via Kalgoorlie-Boulder (KGI) airport gateway; road access via Eyre Highway and Coolgardie-Esperance Highway to Norseman township
03

Project Logistics & B2B Overview

Geographic Location and Topography

Norseman Open Pits is situated within the Dundas Mineral Field, Goldfields-Esperance Region, Western Australia, approximately 725 km east of Perth. The terrain is characterised by semi-arid to arid conditions, with extreme thermal amplitude and episodic rainfall averaging below 300 mm/year. Water supply infrastructure — including licensed borefield extraction and managed aquifer recharge — is operationally critical. The flat to gently undulating lateritic landscape demands engineered haul road compaction and dust suppression protocols to maintain year-round operational continuity.

B2B Lifecycle and Operations

Pantoro Limited holds 100% ownership of the Norseman Gold Project following the full acquisition from the prior 50/50 JV with Tulla Resources, completed June 2023. The operation is classified as active/operating, executing open pit mining across multiple satellite pits within the broader Norseman camp. Workforce deployment relies on:

  • FIFO rotational rosters from Perth and Kalgoorlie hubs
  • Dedicated camp accommodation and catering services in Norseman township
  • Contractor management frameworks for drill-and-blast, load-and-haul, and grade control

Engineering and Extraction Infrastructure

The Norseman processing facility underpins the open pit feed circuit. Key engineering nodes include:

  • Primary crushing and SAG/ball mill grinding circuit for ore comminution
  • Gravity concentration followed by carbon-in-leach (CIL) processing
  • Reagent dosing systems (cyanide, lime, flocculants) requiring strict physico-chemical control
  • Tailings storage facility (TSF) with geotechnical monitoring obligations

Plant throughput optimisation under variable oxide/transitional ore hardness is a primary metallurgical challenge.

ESG, Value Chain and Sustainability

Pantoro's ESG framework at Norseman integrates mandatory Aboriginal Heritage compliance under the WA Aboriginal Heritage Act 1972 (amended), requiring Section 18 consents prior to ground disturbance. B2B procurement priorities include:

  • Preferred supplier engagement with Indigenous-owned enterprises (Ngadju Country traditional custodians)
  • Environmental monitoring for acid mine drainage and groundwater drawdown
  • Scope 1 & 2 emissions reporting aligned with ASX ESG disclosure expectations

Supply chain partners are expected to demonstrate Indigenous Participation Plans as a vendor qualification criterion.

Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.

Procurement

B2B Services Available at this Mine

Specialist contractors and suppliers operating across this mine site.

Supplier?
Serve Central Norseman Gold Mine.
Get listed