REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · SALT

Bullabulling Gold Mine

REGION · Wheatbelt
01

Operation Details

Commodity
Salt
Region
Wheatbelt
District
South West M.F.
Latitude
-31.313994
Longitude
117.337096
02

Compliance & B2B Logistics

Access Logistics & DIDO

DIDO road access via Great Eastern Highway corridor; nearest major hub Northam (~100 km east of Perth); unsealed rural roads likely required for final approach to site.
03

Project Logistics & B2B Overview

Geographic Location and Topography

Bulagin is a salt extraction operation situated within Western Australia's Wheatbelt region, approximately 100–150 km east of Perth. The site occupies low-relief, semi-arid terrain characteristic of ancient lake systems and playa lake formations endemic to the WA interior. Seasonal rainfall variability and flat saline floodplains define the operational envelope. Distance from Perth's industrial supply corridors introduces measurable lead-time risk for consumables, reagents, and heavy equipment, demanding robust inventory buffer strategies from all B2B vendors engaged on-site.

B2B Lifecycle and Operational Status

Bulagin is classified as Operating, indicating active salt harvesting cycles aligned with seasonal evaporation windows typical of Wheatbelt playa systems. No confirmed operator entity is publicly registered for this location, creating due-diligence complexity for prospective B2B suppliers. Operational continuity likely depends on:

  • DIDO rosters from Northam or Perth metropolitan catchment
  • Minimal permanent on-site workforce infrastructure
  • Seasonal scheduling tied to summer evaporation peaks
  • Contract-based maintenance and harvesting crews

Engineering and Extraction Infrastructure

Salt operations at playa-type sites like Bulagin typically employ solar evaporation harvesting rather than conventional comminution circuits. Key engineering components include:

  • Brine concentration ponds with controlled flow management
  • Mechanical harvesters for crystallised salt recovery
  • Wash and screening plant for product grading
  • Stockpile management and bulk-load-out infrastructure

No primary grinding mill or flotation circuit is applicable to this commodity type. Physical-chemical quality control focuses on NaCl purity, moisture content, and granulometry specifications.

ESG, Value Chain and Sustainability

Salt extraction via solar evaporation carries an inherently low direct carbon footprint relative to hard-rock mining, leveraging passive solar energy as the primary process driver. ESG alignment opportunities include:

  • On-site solar PV supplementation for auxiliary equipment power
  • Minimal groundwater drawdown versus conventional extraction
  • Low-emission mechanical harvesting fleet electrification pathways
  • Biodiversity monitoring of adjacent playa lake ecosystems

Formalising an ESG reporting framework remains a key gap given the absence of a publicly identified operator entity.

Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Bullabulling Gold Mine.
Get listed