REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · BAUXITE - ALUMINA

Boddington Gold Mine

OPERATOR · South32 Worsley Alumina Pty Ltd (Operator) — Joint Venture: South32 (86%), Japan Alumina Associates (Australia) Pty Ltd (10%), Sojitz Alumina Pty Ltd TYPE · Open-cut bauxite strip mining with progressive rehabilitation; ore processed via Worsley Alumina refinery (Collie) and export terminal (Bunbury Port) REGION · Peel
01

Operation Details

Operator
South32 Worsley Alumina Pty Ltd (Operator) — Joint Venture: South32 (86%), Japan Alumina Associates (Australia) Pty Ltd (10%), Sojitz Alumina Pty Ltd
Commodity
Bauxite - Alumina
Type
Open-cut bauxite strip mining with progressive rehabilitation; ore processed via Worsley Alumina refinery (Collie) and export terminal (Bunbury Port)
Region
Peel
District
South West M.F.
Latitude
-32.817586
Longitude
116.434911
02

Compliance & B2B Logistics

HSE & Site Induction

South32 Group-level HSE framework applies; critical controls include ground disturbance management, dust suppression, and fauna exclusion protocols within Peel region biodiversity corridors

Access Logistics & DIDO

Road haulage (bauxite ore) from Boddington mining area to Worsley refinery near Collie (~100 km); refined alumina transported via dedicated conveyor/rail corridor to Bunbury Port for export; no standard FIFO/DIDO camp rotation publicly confirmed
03

Project Logistics & B2B Overview

Geographic Location and Topography

The Boddington Bauxite Mine operates within the Peel Region of Southwest Western Australia, approximately 130 km southeast of Perth. The operation sits adjacent to the Darling Scarp and its associated jarrah forest ecosystems, classified as biodiversity-sensitive terrain. Surface hydrology management is critical: the site intersects multiple seasonal drainage lines feeding into the Murray River catchment. Strict hydrological monitoring protocols govern pit dewatering, runoff containment, and post-mining landform reconstruction to protect downstream water quality and wetland buffers.

B2B Lifecycle and Operations

Worsley Alumina operates as a fully integrated bauxite-to-alumina value chain: mine → refinery (Collie) → export terminal (Bunbury). The operation runs 24/7 continuous production, sustaining a heavy diesel burn profile across a fleet of excavators, haul trucks, and ancillary equipment. Power supply to refinery and mine infrastructure depends on grid-connected substation capacity sourced from Western Power's network, with diesel generation providing backup redundancy. B2B procurement cycles cover bulk consumables, reagents, wear parts, and contract maintenance services.

Engineering and Extraction Infrastructure

Bauxite extraction employs open-cut strip mining with shallow bench configurations typical of lateritic deposits. Crushed and screened ore is transferred via an extensive overland conveyor system — a critical infrastructure backbone spanning the corridor between the mine and the Worsley refinery. This conveyor network demands continuous mechanical maintenance, belt replacement programs, and idler management contracts. Material handling intensity is high, with throughput volumes requiring precision conveyor tension and tracking systems to minimize downtime and ore spillage across the full transfer distance.

ESG, Value Chain and Sustainability

South32's Worsley Alumina is formally aligned with South32's Group ESG targets, including a commitment to net-zero Scope 1 and 2 emissions by 2050 with interim 2035 milestones. Active workstreams include evaluation of renewable energy integration (solar PV) to offset refinery thermal load, and progressive rehabilitation of mined areas to native jarrah forest — a globally recognized biodiversity restoration benchmark. Electrification of light vehicle fleets and decarbonization of calcination processes represent the highest-complexity ESG engineering challenges currently under feasibility assessment within the Worsley operational boundary.

Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Boddington Gold Mine.
Get listed