REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · GOLD

Blue Bar Gold Mine

OPERATOR · Calidus Resources Limited (ASX: CAI) / Haoma Mining NL (Profit Share Agreement) TYPE · Open Pit Gold Mining (Alluvial/Hard Rock — Pilbara Greenstone Belt) REGION · Pilbara
01

Operation Details

Operator
Calidus Resources Limited (ASX: CAI) / Haoma Mining NL (Profit Share Agreement)
Commodity
Gold
Type
Open Pit Gold Mining (Alluvial/Hard Rock — Pilbara Greenstone Belt)
Region
Pilbara
District
Marble Bar
Latitude
-21.398997
Longitude
119.704211
02

Compliance & B2B Logistics

Access Logistics & DIDO

FIFO rotational rosters via Port Hedland (PHE) Airport — approx. 200 km southwest of Marble Bar; regional road access via Great Northern Highway
03

Project Logistics & B2B Overview

Geographic Location and Topography

The Blue Bar gold deposit is situated within the Marble Bar district, East Pilbara, Western Australia — one of the most geologically ancient and thermally extreme terrains on Earth. Positioned within the Pilbara Craton's Archaean greenstone belt, the site endures ambient temperatures exceeding 50°C in summer. Extreme aridity defines operational risk: annual rainfall averages below 300 mm, making water supply infrastructure — including bore fields, storage tanks, and recycled process water circuits — a non-negotiable operational prerequisite for any B2B contractor or vendor engaging on-site.

B2B Lifecycle and Operations

Calidus Resources Limited (ASX: CAI) executed a Binding Profit Share Agreement with Haoma Mining NL, unlocking development approval for Blue Bar. The project operates under a structured B2B procurement model typical of junior ASX-listed gold developers. Operational continuity depends on:

  • FIFO rotational rosters (typically 8/6 or 14/7 swing cycles)
  • Fly-in access via Port Hedland Airport (PHE), ~200 km southwest
  • Contracted earthworks, drilling, and processing service providers
  • Local Indigenous Land Use Agreement (ILUA) compliance obligations

Engineering and Extraction Infrastructure

The Blue Bar deposit targets open pit extraction methodology consistent with shallow Pilbara greenstone-hosted gold mineralisation. Material handling relies on engineered conveyor belt systems linking the pit face to the ROM (Run-of-Mine) pad and processing circuit. Key infrastructure considerations include:

  • Crushing and screening plant integration
  • Conveyor transfer stations rated for high-abrasion lateritic and siliceous ore
  • Gravity and/or CIL (Carbon-in-Leach) gold recovery circuit
  • Tailings storage facility (TSF) engineered for arid-climate evaporation rates

ESG, Value Chain and Sustainability

Operating in the Pilbara demands measurable ESG decarbonisation commitments to satisfy ASX disclosure requirements and institutional investor mandates. Blue Bar's sustainability framework is expected to incorporate:

  • Solar hybrid power generation to offset diesel dependency at remote site
  • Battery Energy Storage Systems (BESS) for load-shifting and grid stability
  • Progressive rehabilitation and native vegetation restoration obligations
  • Scope 1 & 2 emissions reporting aligned with TCFD and GRI frameworks
  • Traditional Owner engagement embedded in the project's social licence strategy
Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Blue Bar Gold Mine.
Get listed