REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · LIMESTONE - LIMESAND

Aglime Dongara

OPERATOR · Aglime of Australia / Cockburn Cement Limited TYPE · Open Cut / Quarry — Limestone and Limesand REGION · Mid-West
01

Operation Details

Operator
Aglime of Australia / Cockburn Cement Limited
Commodity
Limestone - Limesand
Type
Open Cut / Quarry — Limestone and Limesand
Region
Mid-West
District
South West M.F.
Latitude
-29.279023
Longitude
114.926035
02

Compliance & B2B Logistics

Access Logistics & DIDO

Road haulage via Brand Highway and North West Coastal Highway (Indian Ocean Drive corridor); regional distribution hub at Dongara–Port Denison servicing Mid-West agricultural and industrial markets
03

Project Logistics & B2B Overview

Geographic Location and Topography

The Dongara Aglime operation is situated within the Mid-West region of Western Australia, approximately 350 km north of Perth near the coastal town of Dongara–Port Denison. The terrain is characterised by low-relief coastal plains with shallow calcrete and aeolian limestone deposits — a topographic profile that minimises overburden stripping ratios and facilitates high-volume mass earthmoving with reduced vertical bench complexity. Flat gradients support efficient haul road layouts and maximise payload cycles for articulated dump trucks operating across the pit floor.

B2B Lifecycle and Operational Framework

The site operates under a dual-entity structure: Aglime of Australia manages agricultural lime dispatch and loading logistics, while Cockburn Cement Limited oversees the Dongara lime plant and Denison Limesand industries. This split-operator model demands rigorous vendor coordination for consumables, wear parts, and contracted services. B2B suppliers must engage separate procurement channels per entity. Minimising unplanned downtime is operationally critical — proximity to qualified mechanical workshops in Geraldton (~60 km south) is the primary mitigation strategy for mobile plant breakdowns.

Extraction Engineering and Infrastructure

Limestone and limesand extraction relies on drill-and-blast or ripping techniques suited to the soft-to-medium formation hardness typical of coastal calcarenite. Crushed and screened product is transferred via conveyor belt systems linking the primary crusher to stockpile and load-out facilities. Conveyor infrastructure at this scale demands scheduled idler replacement, belt tension monitoring, and dust suppression integration. The Port Denison proximity enables bulk maritime export as a secondary logistics pathway, complementing road-based agricultural distribution across the Wheatbelt and Mid-West zones.

ESG, Value Chain and Sustainability

Agricultural lime operations inherently contribute to soil carbon sequestration and pH correction, positioning Dongara Aglime within the ESG narrative of sustainable food-system inputs. Cockburn Cement's broader decarbonisation roadmap — including clinker substitution and process heat optimisation — cascades sustainability obligations to site-level operations. Opportunities exist for solar-assisted power generation to offset grid consumption at crushing and conveying circuits. Fleet electrification pathways for light vehicles align with WA Government net-zero targets, creating procurement opportunities for EV-compatible infrastructure suppliers operating in the Mid-West corridor.

Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Aglime Dongara.
Get listed